TABLEAUX TR4 800 A - TR8 1200 A TUR Low Voltage Distribution Board
High-capacity TUR distribution board for 1000 kVA transformers. Dimensions 1450 x 900 x 540 mm, fixing centres 760 ± 20 mm horizontal and 590 mm vertical. It uses 4 x 240 mm² or 2 x 630 mm² per phase, and 2 x 240 mm² or 1 x 630 mm² for neutral. Upstream connection includes three U-shaped interphase brackets and six connection plates at 30 ± 5 Nm. The 1800 A handle is fixed with two M8x20 screws with captive washers.
The TR8-1200 is a TUR distribution board designed for 1000 kVA transformer connections, making it the highest-capacity model in this range. Its dimensions are 1450 x 900 x 540 mm, with recommended fixing centres of 760 ± 20 mm horizontally and 590 mm vertically. It requires 4 x 240 mm² or 2 x 630 mm² aluminium cables per phase, and 2 x 240 mm² or 1 x 630 mm² for the neutral. For upstream connection, it uses three U-shaped interphase connection brackets and six connection plates, tightened to 30 ± 5 Nm. The 1200 A switch handle is connected with two M8x20 screws with captive washers in the right upright inserts. This model is intended for demanding high-power transformer-to-distribution connections.
Principais parâmetros técnicos
Main mechanical parameters
Item
Unidade
Parâmetro
Corrente nominal
A
1200
Dimensions (H x W x D)
mm
1450 x 900 x 540
Recommended Fixing Centers (H / V)
mm
760±20 / 590
Fixing Holes
–
4 x M14
Transformer Power
kVA
1000
Recommended Cable per Phase (ALU)
mm²
4 x 240 or 2 x 630
Recommended Neutral Cable (ALU)
mm²
2 x 240 or 1 x 630
Fuse Type
–
T2 (115mm, 440V)
Barramentos
Nm
N, Ph1, Ph2, Ph3
Mounting Type
–
Wall-mounted
Switch Handle Position
mm²
Up=Closed(Red) / Down=Open(Green)
MALT Earthing Torque
Nm
30±5
Handle Mounting Torque
Nm
2 x M8x20
Upstream Connection Torque
Nm
30±5
Side Panels Torque
Nm
30±5
Monobloc Outgoing Feeder Torque
Nm
30±5
Functional Features:
Electrical function: suitable for a 1000 kVA transformer LV main incoming/main switch; switch rated current 1200 A.
Operation: manual switch operation; handle up = CLOSED (red), down = OPEN (green); padlocking possible in the OPEN position; handle fixed with 2 M8x20 screws and captive washers into the right upright inserts.
Safety and protection: earthing connection; side panels, horizontal protection screen, removable screen to prevent direct contact with live parts.
Expansion: optional EP lighting, ACG general switch, reservation panel, monobloc outgoing units, fuse protection.
Difference: upstream connection requires 3 interphase U-shaped connecting brackets and 6 connection plates; horizontal protection screen mounted via a screen support bracket.
.
ESTAMOS AQUI PARA APOIÁ-LO!
Mais informações ou uma consulta pessoal? Nossos produtos e know-how
estão à disposição para oferecer soluções.